REALIZATIONS

 

Asphalt mixtures

 

I/3 ČB křižovatka Pražská-Okružní, realization: October 2014 – VMT 22 + Licomont BS 100 : 6707m2/100mm, overall 1.594 t, 9 tons, coating plant: Skanska České Budějovice

1/24 Majdalena – Cejp, realization: 22nd August 2015 – VMT 22 + Licomont BS 100: 15445,2m2/80mm, overall 2.965  t + 5 tons of the ingredient, coating plant Skanska České Budějovice

Klenčí: 2/189, realization: April 2015 –  ACO 11 S + Licomont BS 100, overall 1.560 t – ACO 22 S + Licomont BS 100, overall 2.440 t,  coating plant Bohemia Asfalt Šlovice

Mašovice: realization: May 2015 – ACL 22 S + Licomont BS 100, overall 3.130 t – SMA 11 S + Modicel, overall 1.980 t, coating plant Bohemia Asfalt Šlovice

 

Mastic asphalt modified by Licomont BS 100

 

Praterbruecke, Vienna , Austria, MA 11 PmB 25/55-65 M1 G4 TA + MA 8 PmB 25/55-65 M1 GS TA. Teerag Asdag Porr/Asfinag

The building Březhrad, realization: April 2013, MA11IV, 20/30, 413t EUROVIA

D1 Šternov, realization: October 2013, MA11IV, PMB 10/40-65,  560t, EUROVIA

Nuselský most (Nuselský Bridge), realization: June 2014, MA11IV, PMB 10/40-65, 704t, EUROVIA

D 11 Opatovice most (Opatovice Bridge), realization July-November 2015, MA11IV, PMB 10/40-65, 1.586t, SKANSKA

Tram. trať Plzeňská (tram line Plzeňská), realization September-October 2015, MA16I, 20/30 + MA11IV, PMB 10/40, 1.317t, EUROVIA

R7, realization July 2013, MA11IV, PMB 10/40-65, 453t,  SKANSKA

Tram. trať Bělohorská (tram line Bělohorská), realization October 2014, MA16I, PMB 10/40-65 + MA11I, PMB 10/40-65 1.638t    SKANSKA

Tram. trať Evropská (tram line Evropská), realization November-December 2013, MA16I, 20/30,  1.203t, EUROVIA

We will create an individual offer.